Building an entire drinking Water Treatment Plant processing 43200 m3/day in less than a year? Esli rose to the challenge! Esli, part of Pollet Water Group, designs, engineers, manufactures and assists with extensive expertise in solutions within the water & wastewater sector. For this project in Bursa (Turkey), they went even further by also taking on the construction of entire plant.
The well water enters the plant through the central piping and is divided to 2 storage tanks (A and B). Each tank has a capacity of 500m³ and a flow of 900 m³/h. After the storage tank, chlorine dosing disinfects the water and helps to oxidate the Mn in the feed water. Finally the filtration units (seven filters in each line) remove the Mn from the water.
Discover more Esli projects. Comments are closed.
|
PWGDiscover our network of specialized water treatment companies. Follow PWG on |